Nauta completed repair of drilling rig Lotos Petrobaltic - MarinePoland.com
Nauta completed repair of drilling rig Lotos Petrobaltic
Date of publication: 21.05.2015
The repair of drilling platform Lotos Petrobaltic came to the end. The platform is ready to start work on B8 oil field.

In dry dock SD I Lotos Petrobaltic  underwent comprehensive class repair. The scope of works included, among others, an inspection of the hull, repairs of legs and tanks, coating works, inspection of the pipelines and renewal of the shift rig system. All repair was performed under the supervision of the American Bureau of Shipping classification society.

Lotos Petrobaltic is a jack-up (self-elevating) oil rig and it was built in 1989 in a shipyard in Singapore. Previously conducted drilling in the waters of West Africa, working for the company Transocean Offshore Gulf of Guinea.